Project Title: Primrose Hotel – Exterior Wall Rehabilitation
Project Location: 111 Carlton Drive, Toronto
Owner: Knightstone Capital Management
Project Start: Summer 2015
Project Completion: Fall 2015
Consultant: RJC Ltd.
K.I.B. Building Restoration Inc. carried out significant concrete deterioration repairs and building envelope coatings at this landmark building downtown Toronto. The work included more than 4,500ft² of concrete vertical surface repair on a fluted concrete wall. Various methods to access the walls included swing stage and mast climber to facilitate the work. Pedestrian and vehicle access was maintained throughout the work by setting up and maintaining overhead walkthrough scaffold to meet the City of Toronto standards, and power line protection while working near live wires.